project name | nanjing garden city happy blue sea cinema | project introduction | ks9000、s2、g612、f2 |
---|---|---|---|
project date | 2019.12 | equipment used | ks9000、s2、g612、f2 |
project location | nanjing | project requirements | there are a total of 33 pillars, each of which has two display surfaces and a total of 66 surfaces. the project requires four complete pictures from four perspectives |
view all cases
-
shenzhen baoan creative museum
project name:shenzhen baoan creative museum
project date:2020.01
project location:
project introduction:2304×1536,p4
-
hubei kongjing ktv party room
project name:hubei kongjing ktv party room
project date:2022.05
project location:wuhan, hubei province
project introduction:multiple screens realize scene linkage.
-
yan'an wuqi science and technology museum
project name:yan'an wuqi science and technology museum
project date:2020.09
project location:yan'an
project introduction:1. an arched screen on the front with a resolution of 2688 * 3008 2 surrounded by an ultra long strip screen, surrounded by three sides, with a resolution of 45952 * 896 3 an arc screen, resolution: 3840 * 1024 4 the two circles are called
-
shijiazhuang gymnasium, hebei province
project name:shijiazhuang gymnasium, hebei province
project date:2021.01
project location:shijiazhuang
project introduction:1. main screen 4096 × one thousand one hundred and twenty × 2. strip screen
-
a bar in zunyi
project name:a bar in zunyi
project date:2020.07
project location:zunyi
project introduction:control all led screens with effects on the resolume software
-
nanjing garden city happy blue sea cinema
project name:nanjing garden city happy blue sea cinema
project date:2019.12
project location:nanjing
project introduction:ks9000、s2、g612、f2
-
datang network exhibition hall
project name:datang network exhibition hall
project date:2020.12
project location:jinan city, shandong province
project introduction:special shaped triangular module, three sides of the whole screen.
-
miami bar in peixian county
project name:miami bar in peixian county
project date:2020.12
project location:xuzhou, jiangsu
project introduction:one main screen, one dj console, six auxiliary screens, thirty-six box screens and five vertical screens